Construction of 400 kV OHTL interconnection from SS Bitola 2 to Macedonian/Albanian border and SS 400/110 kV Ohrid 400 kV interconnection transmission line Bitola (Macedonia) - Elbasan (Albania) is the last part of the implementation of the Corridor 8 in the context of creating a corridor East-West power transmission corridor between Bulgaria, Macedonia, Albania and Italy. Within this interconnection is envisaged construction of a new 400/110 kV substation in the Ohrid-Struga region, which would resolve the problems that exist in the south-western part of the transmission network.
Thisproject is one of three projects in Southeast Europe which was interesting for the community of donors/financiers of energy projects by the European Commission (donors/financiers who finance the IPF Multi program in which established a new instrument to support economic development in the region - the Western Balkans Investment Framework (WBIF)). On the Steering Committee of WBIF was approved grant for preparation of Feasibility Study and ESIA for this project. Project was named WB4bis-REG-ENE-01 and will be realized by consortium of international experts led by COWI (DK). Donors/financiers of this project are the European Bank for Reconstructionand Development (EBRD) and KfW.
Documentation
Feasibility Study and ESIA for Elbasan (AL) - Bitola (MK)400 kV Transmission Line
1_400kV MK-Al-ESIA REPORT_final
2_400kV MK-AL-ESIA.Appendix 1.1
2_400kV MK-AL-ESIA.Appendix 1.2
2_400kV MK-AL-ESIA.Appendix 1.3
2_400kV MK-AL-ESIA.Appendix 1.4
2_400kV MK-AL-ESIA.Appendix 1.5.1
2_400kV MK-AL-ESIA.Appendix 1.5.2
2_400kV MK-AL-ESIA.Appendix 1.6
2_400kV MK-AL-ESIA.Appendix 1.7
2_400kV MK-AL-ESIA.Appendix 1.8
3_400kV MK-AL-ESIA Non Technical Summary
4_WB4bis.MKD ESIA ESAP.30.11.2012
5_WB4bis.MKD.ESIA.SEP.STAKEHOLDER ENGAGEMENT PLAN.14.10.2012
Macedonian Stakeholder Engagement Plane,June 2015
Land Acquisition and Compensation Framework (LACF)
Project Updated Non-Technical Summary 400kV Transmission Line, SS Bitola 2 – Macedonian/Albanian border and SS Ohrid
Environmental and Social Action Plan 400kV Transmission Line, SS Bitola 2 – Macedonian/Albanian border and SS OhridIntention for project implementation
Summer report on As.Study of birds and bats along 400 kV OHTL MKD_AL
Autumn report on As.Study of birds and bats along 400 kV OHTL MKD_AL
1_400kV MK-Al-ESIA REPORT_final
2_400kV MK-AL-ESIA.Appendix 1.1
2_400kV MK-AL-ESIA.Appendix 1.2
2_400kV MK-AL-ESIA.Appendix 1.3
2_400kV MK-AL-ESIA.Appendix 1.4
2_400kV MK-AL-ESIA.Appendix 1.5.1
2_400kV MK-AL-ESIA.Appendix 1.5.2
2_400kV MK-AL-ESIA.Appendix 1.6
2_400kV MK-AL-ESIA.Appendix 1.7
2_400kV MK-AL-ESIA.Appendix 1.8
3_400kV MK-AL-ESIA Non Technical Summary
4_WB4bis.MKD ESIA ESAP.30.11.2012
5_WB4bis.MKD.ESIA.SEP.STAKEHOLDER ENGAGEMENT PLAN.14.10.2012
Macedonian Stakeholder Engagement Plane,June 2015
Land Acquisition and Compensation Framework (LACF)
Project Updated Non-Technical Summary 400kV Transmission Line, SS Bitola 2 – Macedonian/Albanian border and SS Ohrid
Environmental and Social Action Plan 400kV Transmission Line, SS Bitola 2 – Macedonian/Albanian border and SS OhridIntention for project implementation
Summer report on As.Study of birds and bats along 400 kV OHTL MKD_AL
Autumn report on As.Study of birds and bats along 400 kV OHTL MKD_AL